|
PriMus |
PriMus IFC |
PriMus PLUS |
PriMus FULL |
COST ESTIMATE, BOQS AND QUOTES |
BoQ and work estimate |
|
|
|
|
Bids and proposals |
|
|
|
|
Analysis of construction site needs |
|
|
|
|
Accounting |
|
|
|
|
Importing and exporting to standard formats (XLS, DOC, ...) |
|
|
|
|
Import of databases, price lists and price books |
|
|
|
|
QUANTITY TAKE OFFS FROM IFC FILES |
Open IFC standard formats of BIM or 3D CAD models |
|
|
|
|
View and navigate 3D BIM or CAD models directly in the integrated viewer |
|
|
|
|
Assignment of Price List items to BIM or 3D CAD objects |
|
|
|
|
Automatic measurements with artificial intelligence from 3D BIM or CAD model |
|
|
|
|
Constantly updated cost estimate when editing the 3D BIM or CAD model |
|
|
|
|
Data export in Word™, Excel™ formats |
|
|
|
|
QUANTITY TAKE OFF FROM CAD DRAWINGS OR RASTER FILES |
Opening of standard DXF/DWG CAD DRAWING FILES |
|
|
|
|
Raster (PDF, BMP, JPG, etc.) management |
|
|
|
|
Associate Price list items to graphical entities |
|
|
|
|
Quantity Takeoff from CAD files |
|
|
|
|
Quantity Takeoff from PDF files |
|
|
|
|
Take off from image files |
|
|
|
|
Dynamic BoQ updating when editing drawing models |
|
|
|
|
Connection with your CAD or your CAD environment in PriMus TAKEOFF |
|
|
|
|
CONSTRUCTION SCHEDULING |
Integration with other Project time Schedules or construction cost estimates |
|
|
|
|
Works financial plan analysis and control |
|
|
|
|
Works resources analysis integrated with the construction cost estimate |
|
|
|
|
Work resources analysis integrated within the BoQ document |
|
|
|
|
Job resources requirements analysis |
|
|
|
|
Activity scheduling, resources analysis between the design and construction phases |
|
|
|
|
Data export in Excel and PDF |
|
|
|
|
GANTT, charts and reports printout management |
|
|
|
|